Installation Instructions

Double Bricked Walls

Design No. C2b

Concrete Panel Walls

  1. Install chosen channels or furring channel clips at required spacing for plasterboard lining.
  2. Fit AIR-CELL® over channels and hold in position with tape or screws, or cut slots for the AIR-CELL® to fit over the wings of the channel clips.
  3. Butt join rolls of AIR-CELL® and tape with 72mm wide reinforced aluminium tape.
  4. Install second channel by screwing, or clipping into channel clips.
  5. Install plasterboard lining.

+ Download Installation Brochure

These instructions are guidelines only and should be interpreted with consideration for the specific building design. This installation of AIR-CELL® should be in conformance with the applicable clauses from AS 3999 and AS/NZS 4200.2 unless otherwise specified.

AIR-CELL® can be damaged by intense heat above 135˚ C and contact with sparks and flame from blow torches, welders, cutting tools, etc. must be avoided.

The installer must make due provision for safety when installing AIR-CELL® in any application.

 

These instructions are guidelines only and should be interpreted with consideration for the specific building design. This installation of AIR-CELL® should be in conformance with the applicable clauses from AS 3999 and AS/NZS 4200.2 unless otherwise specified.

AIR-CELL® can be damaged by intense heat above 135˚ C and contact with sparks and flame from blow torches, welders, cutting tools, etc. must be avoided.

The installer must make due provision for safety when installing AIR-CELL® in any application.

Handling and Storage

AIR-CELL® Insulation products must be transported in its protective packaging and kept clean and dry. Standing rolls on end reduces risk of damage should moisture be present in the packaging. Surfaces must be kept free of contaminants such as dust and grease, and must not be stored with foil surfaces in contact with alkaline materials i.e. wet cement, lime, etc.